1.800.423.HEAT(4328)
Request a Quote

Category

Tampa, Florida
To our valued customers, suppliers, and business partners, as states begin to shut down nonessential businesses, we are letting you know that Braddock Metallurgical has been determined by the authorities to be an essential business. As an industrial supplier servicing the military, medical, energy, and aerospace industries, all of our facilities are open for business and...
Continue Reading
Our Tampa (Riverview), FL, facility has capabilities for thermal cycling (Heat – Cool – Heat). Our state of the art equipment and instrumentation allow us to perform multiple thermal cycles within the same chamber, with controlled ramp rates during heating and cooling during these stabilization cycles.
Continue Reading
New Large Stress Relieving Furnace in Tampa! In order to meet your needs, our Tampa facility has recently installed a new large car bottom furnace in South Florida. Stress Relieving, Normalizing and Annealing your tanks, vessels, weldments, as well as Precipitation / Age Hardening of full length bars up to: 18ft x 6ft x 6ft
Continue Reading
Steve Braddock, CEO, Braddock Metallurgical, passed away on February 16, 2017 at the age of 69, surrounded by family. He was the son of William Ray and Helen Good Braddock, who preceded him in death. Steve was raised in Martinsville, NJ and served as a medic in the United States Navy before joining his father...
Continue Reading
It’s hard to believe that Braddock Metallurgical started with one salt pot furnace. But that’s how it began, when William Braddock Sr. heat treated tooling for local machine shops. http://www.industrialheating.com/articles/92866-braddock-metallurgical
Continue Reading
Braddock Metallurgical is proud to announce the addition of a new Territory Manager who will represent Southern Florida. Bill Donnelly has many years of experience in sales and marketing of industrial products. He has worked with engineers, contractors, distributors, and end users to solve problems and build relationships. We are excited to have Bill join...
Continue Reading
•In June of 2013 we relocated our Riverview/Tampa facility into a larger 26,000 square foot building. •In addition to the existing equipment the expansion into the new building included an additional Surface Combustion Super 36 Allcase Furnace as well as a new Surface Combustion Endothermic Generator. This essentially doubled our existing oil quench and carburizing...
Continue Reading